FIMSby DoozieSoft Book a discovery visitBook a visit

For bolt, nut and fastener plants

“Send me the Test Certificate.” Answer before the call ends.

FIMS is a Manufacturing Control System (MCS) for fastener plants. It builds the Test Certificate from records your plant already keeps: the Heat Number logged when the wire rod arrives, the hardness and tensile results your QC checks against the property class, and the invoice line the batch ships on.

From ₹71,999 onboarding, with the first year’s AMC and five users included. Annual AMC from ₹36,000 from month 13. Ex-GST. 30-day money-back guarantee. Plans and calculator

  • QCThe certificate is ready at quality clearance.
  • RELQC clearance is a release decision, recorded with the batch.
  • DSPEvidence travels with the goods: a QR code on the dispatch package.
Drawing of a hex bolt M12 by 60, DIN 933, with an end view of the head marked 8.8 and DF, width across flats 19 mm, head height 7.5 mm, thread M12 by 1.75 and length 60 mm. Leaders tie the shank to Heat HT-98421 and batch FG-2026-B089. 8.8 DF SW 19 60 7.5 M12 × 1.75 HEAT HT-98421 FG-2026-B089 60 M12 × 1.75 k 7.5 SW 19 HT-98421 FG-2026-B089
Title
Hex bolt M12 × 60 · DIN 933
Dwg no.
FIMS-TC-001
Scale
NTS
Class
8.8 · ISO 898-1
Material
10B21
Heat
HT-98421
Batch
982 pcs
Drawn
Stores
Checked
QC lab
Approved
QC cleared
Data
Sample
Sample drawing of the demo bolt, with the heat and batch it was made from

Built for fastener plants

If you make bolts, nuts or cold-forged parts, this is about your plant.

Your customers ask for the Test Certificate with the Heat Number on it. FIMS is built around that question, not around a generic factory.

Parts

  • Hex bolts and screws
  • Nuts
  • Studs and threaded rods
  • Socket and machine screws
  • Special cold-forged parts

Property classes

  • 4.6
  • 5.6
  • 8.8
  • 10.9
  • 12.9
  • Nut 8
  • Nut 10

You keep separate limits for each class and grade. Every batch result is checked against them.

Standards you supply against

  • ISO 898-1
  • ISO 898-2
  • IS 1367
  • DIN 933 / 931 / 934

You enter the limits for the standards your customers specify. FIMS does not ship a standards library.

Process route · Wire rod to dispatch

Your route, from wire rod to dispatch, on one record.

A typical route for a class 8.8 hex bolt. You set the route for each item; FIMS keeps the record at every operation.

  1. OP 10

    Wire rod inward

    Heat Number, lot and mill certificate chemistry, with a hold until incoming QC clears the coil.

  2. OP 20

    Wire drawing and annealing

    An operation on the route card, with in-process readings where you record them.

  3. OP 30

    Cold forging

    Route card for the order, with rejection and scrap booked against the operation.

  4. OP 40

    Thread rolling

    In-process dimensional checks against the drawing for that item.

  5. OP 50

    Heat treatment

    Furnace log and heat-treatment lot, linked to the batch tests that follow.

  6. OP 60Often job work

    Plating or coating

    Job-work challan out to the plater, the contractor ledger and the job-work invoice.

  7. OP 70

    Final inspection and batch tests

    Hardness, tensile and other tests checked against the property-class limits. A failed test stops the certificate.

  8. OP 80

    Packing and dispatch

    GST invoice, packing list, the Test Certificate and the evidence package with its QR code.

View A · The 4:30 PM call

Four questions come with every dispatch.

  1. Is the order ready?OA-2026-001 · 982 pcs in finished batch FG-2026-B089
  2. Which heat went into it?HT-98421 · inward RIN-2026-00442
  3. Did quality clear it?Final QC passed · 1,000 inspected, 982 passed, 18 rejected
  4. Can you send the Test Certificate and the evidence?TC-INV2026001-FG-2026-B089 · bound to INV-2026-001

In most plants these answers sit in four places. Someone has to find each one while the customer waits, and the answer depends on who is in the plant that day.

StoresInward register with the Heat Number
QCTest file for the batch
FloorWhatsApp group for the route
AccountsInvoice in the billing system

FIMS keeps them on one record, from the customer’s order to the dispatch. The answers above come from the sample plant on this page.

Section B–B · The Test Certificate

Every line on the certificate has a source in your plant.

An illustration on sample data from a fictional plant. The numbered pins show where each part comes from.

Test Certificate

Doozie Fasteners Pvt. Ltd. (fictional demo plant)

Sample data
Certificate no.
TC-INV2026001-FG-2026-B089
Date
19 Jul 2026
Customer
Apex Mobility Components
Invoice 4
INV-2026-001 · part APEX-P-1
Item
Hex bolt M12 × 60, DIN 933
Property class · standard
8.8 · ISO 898-1
Heat Number 1
HT-98421
RIN · mill
RIN-2026-00442 · Sentinel Steel Long Products Ltd.
Batch 2
FG-2026-B089 · 982 pcs
Material
10B21
Chemical composition, % 1
ElementSpecificationResultStatus
C0.18 – 0.230.210Pass
Mn0.70 – 1.000.850Pass
P≤ 0.0300.018Pass
S≤ 0.0500.015Pass
B0.0005 – 0.0030.0025Pass
Mechanical and heat treatment 2
TestSpecificationResultStatus
Tensile strength, MPa≥ 800835Pass
Yield strength, MPa≥ 640680Pass
Elongation, %≥ 1214Pass
Reduction of area, %≥ 5258Pass
Hardness, HRC22 – 3229Pass
Tempering, °C≥ 425560Pass
Sample signatoryQuality Manager 3
Sample signatoryLab In-charge
Ready to issue
  1. Raw-material inward

    The Heat Number, RIN and the mill certificate’s chemistry are recorded when the steel arrives, and the lot can be held until incoming QC clears it.

  2. Batch tests

    Your QC records mechanical and heat-treatment results for the finished batch, in your own lab or from an external NABL lab. Each value is checked against the limits for that grade.

  3. Signatories

    The certificate carries the signatures your process needs. A Material Test Certificate (MTC) can carry three signers.

  4. Invoice line and verification

    The certificate is bound to the invoice line the batch ships on and kept in the certificate archive. Its number goes on the dispatch evidence package, whose QR code your customer scans to check the batch, the heat and the certificate.

See what an out-of-spec reading does

Change the hardness on the sample to 34 HRC, above the 32 HRC maximum for property class 8.8.

Detail C · Heat to customer

One line from the steel coil to your customer’s scan.

When a complaint arrives against an invoice, you find the heat, the inward lot, the route card and the batch tests in one place.

  1. HT-98421

    Heat Number and chemistry from the mill certificate

  2. RIN-2026-00442

    Raw-material inward, with an optional hold until incoming QC clears it

  3. RC-2026-001

    Route card for each operation, heat treatment included

  4. FG-2026-B089

    Finished batch, tested against the specification

  5. INV-2026-001

    Invoice line with the certificate bound to it

  6. Verify

    Your customer scans the dispatch package QR to check batch, heat and certificate

Who uses it

One record, read by everyone who answers the customer.

Owner

Answers that don’t depend on who is in today

  • Order, heat, QC status and certificate on one trail
  • Overdue receivables and pending dispatches in one place
  • Your plant priced by plan, in a calculator, before you commit
Quality head

The certificate is ready at quality clearance

  • Specifications and limits per grade and property class
  • A failed test stops the certificate until the retest passes
  • NC, corrective actions and a controlled document register
Stores and dispatch

The Heat Number follows the batch

  • Heat, lot and mill certificate captured at inward
  • Delivery challan, GST invoice and packing list
  • Dispatch evidence package with a QR code for the customer

Schedule E · Price your plant

What FIMS costs, in full.

Five plans, one onboarding price each. Onboarding includes the first year’s AMC and five users. From month 13 you pay the annual AMC. GST is extra. Work out your own number in the calculator below.

Plans · one plant · all prices ex-GST
PlanOnboardingOne-time. Includes the first-year AMC and 5 users.Annual AMCFor 5 users. Billed from month 13.
Certificates Only1 module₹71,999₹36,000
Quality Plant5 modules₹1,49,999₹45,000
Order to Dispatch7 modules₹4,50,000₹55,000
Inward to TC16 modules₹5,50,000₹65,000
Full Plant AI17 modules₹6,50,000₹75,000

In every plan

  • Five users included, minimum five per plant
  • Your own private hosted copy
  • First-year AMC included in onboarding
  • Standard master import included

After year one

  • Annual AMC from month 13, billed in advance on a common anniversary
  • AMC = the plan’s five-user AMC ÷ 5 × your users
  • Replacing a user is free; a lower user count applies at the next renewal

Not in these prices

  • GST at 18%
  • Calibration, sold separately
  • Assisted, legacy and historical data migration, priced below
  • Each further plant, priced on its own

Before you pay

  • 30-day money-back guarantee if you are not satisfied, terms below
  • Guided demo on request

What each plan adds

Plan 1

Certificates Only

Onboarding ₹71,999 · AMC ₹36,000 a year

  • Test Certificates
Over Certificates Only

Quality Plant

Onboarding ₹1,49,999 · AMC ₹45,000 a year

  • QC Operations
  • NC, CAPA and documents
  • Inventory and FG batches
  • RM Inward with Heat Number
Over Quality Plant

Order to Dispatch

Onboarding ₹4,50,000 · AMC ₹55,000 a year

  • Sales Desk
  • Dispatch and GST Invoice
Over Order to Dispatch

Inward to TC

Onboarding ₹5,50,000 · AMC ₹65,000 a year

  • Purchase
  • RFQ to PO approvals
  • Receivables and Payables
  • Planning and Production
  • Job Work and Contractors
  • Shop-floor screens
  • Heat Treatment
  • Traceability
  • Costing, GSTR-1 report and MIS
  • AI Owner Chat is not in this plan
Over Inward to TC

Full Plant AI

Onboarding ₹6,50,000 · AMC ₹75,000 a year

  • AI Owner Chat

Includes a defined monthly AI usage allowance set out in your quotation; usage above it is charged separately, and AI usage is never unlimited.

Modules in each plan

  • ReadyIn FIMS today
  • PartialIn FIMS, with the gaps named
  • PilotSet up with you first on your own data
  • PreviewShown on sample data, not for daily use yet
Modules in each plan
ModuleCertificates OnlyQuality PlantOrder to DispatchInward to TCFull Plant AI
Quality and certificates
Test CertificatesPilot●●●●●
QC OperationsReady–●●●●
NC, CAPA and documentsReady–●●●●
Material
Inventory and FG batchesPartial–●●●●
RM Inward with Heat NumberReady–●●●●
PurchaseReady–––●●
RFQ to PO approvalsReady–––●●
Sales and dispatch
Sales DeskReady––●●●
Dispatch and GST InvoicePartial––●●●
Receivables and PayablesPartial–––●●
Production
Planning and ProductionReady–––●●
Job Work and ContractorsReady–––●●
Shop-floor screensReady–––●●
Heat TreatmentReady–––●●
Owner view
TraceabilityReady–––●●
Costing, GSTR-1 report and MISReady–––●●
AI Owner ChatPreview––––●

The GSTR-1 report is a report you export; it is not an integration with the GST portal. Not offered today: e-invoice (IRN) and e-way bill, automatic Tally sync, a vendor portal, multi-plant in one copy, and an open API.

Add-on modules

Add-on

Customer Portal

A portal login for your customers: three users per customer, capped at 100 customers.

₹30,000 a year, fixed, ex-GST

Add-on

Calibration

Instrument register and due alerts; undated instruments can be blocked from use. Sold separately, for any plan.

₹18,000 a year, fixed, ex-GST

Price calculator

1 · Plan
2 · Users at onboarding

Five are included. Each extra user in the first year is ₹10,000 per user a year (introductory first-year price).

3 · Users added during year one

Prorated for the months remaining at the introductory first-year price. Add as many times as you need.

4 · Data migration
5 · Tax

Schedule E · Data migration

Bring your masters in. One time, and it never raises the AMC.

Migration is a one-time service. Pick the package that matches the state of your data.

Data migration packages · one-time
PackageWhat it coversPrice
Standard master importClean data in FIMS templates, up to 5,000 master records, one production import.Included
Assisted importMapping your existing Excel, formatting, duplicates and validation, up to 5,000 records, two attempts.₹15,000
Legacy ERP migrationOne system, up to about 25,000 records. Counted in the totals as ₹50,000.From ₹50,000
Historical transaction migrationQuoted separately. Not included in the totals.Custom quote

Complex migrations are charged at ₹2,000 an hour, against an estimate you approve before work starts.

Who does what

ResponsibilityCustomerDoozieSoftJoint
Extraction and preparation of your data (unless you buy the paid service)●
Business data correctness●
Final migration acceptance (sign-off)●
Templates and import validation●
Opening-stock reconciliation●

Route card · How it starts

One product family first. Then FIMS on your own data, with a 30-day money-back guarantee.

Route card
RC-PILOT
Item
Your plant
Earliest start
7 Dec 2026
  1. OP 10

    Discovery visit

    Thirty minutes at your plant on one product family and one control gap, such as the certificate your customers ask for most.

    → Fit notes
  2. OP 20

    Fit check

    We check FIMS against your route, your material records and your certificate conventions, and agree what we start with.

    → Starting scope and modules
  3. OP 30

    FIMS on your own copy

    FIMS runs on a private hosted copy for your plant. Your data is never shared with another plant.

    → Certificates on your own data
  4. OP 40

    Measure and decide

    We agree the measures with you first, for example the time it takes to prepare a Test Certificate today, and compare against them.

    → Your decision
Guarantee
30 daysMoney back if you are not satisfied
How it works
Use FIMS on your own copy for 30 days from onboarding. If it does not satisfy you, tell us within those 30 days.
Refund
All onboarding money back, except GST and the time spent on data import and support. The terms are written into your quotation.

Onboarding starts from 7 December 2026 at the earliest.

Notes

What fastener plant owners and quality heads ask first.

Does FIMS replace Tally?

No. Your accounts stay where they are. There is no automatic Tally link today. At the visit we look at how your invoice lines would reach FIMS.

Our invoices are raised outside FIMS. Can we still issue certificates?

Not yet. Today a certificate is bound to an invoice raised in FIMS. Issuing certificates against invoices from another billing system is not available yet.

Can the certificate follow our format?

FIMS prints the certificate with your signatories. Whether your exact layout fits is checked at the visit, using certificates your customers accept today.

Can we keep different limits for 8.8 and 10.9?

Yes. You set specifications and limits per grade and property class, and each batch result is checked against the limits for that class.

We send plating and heat treatment to job workers. Does FIMS track that?

Yes. Job-work challans, the contractor ledger and job-work invoices are in FIMS, so material sent out stays on the same record.

We send samples to an outside lab. Does that work?

Yes. Batch results can be recorded from your own lab or from an external NABL-accredited lab, and each value is checked against the specification for that grade.

What does onboarding include?

The plan’s modules for one plant as your own private copy, the first year’s AMC, five users and the standard master import. Onboarding runs from ₹71,999 (Certificates Only) to ₹6,50,000 (Full Plant AI), ex-GST. Calibration is not included; it is sold separately.

What do we pay after the first year?

The annual AMC from month 13, billed in advance on a common anniversary: the plan’s five-user AMC (₹36,000 to ₹75,000) divided by 5 and multiplied by your users. Renewal assumes the same users and the same rate. GST at 18% is extra.

What if we need more than five users?

Extra users at onboarding, and users added during the first year, cost ₹10,000 per user per year, prorated for the months remaining. This is introductory first-year pricing. After year one the plan’s AMC rate applies. Replacing a user is free, and a lower user count applies at the next renewal.

What does Full Plant AI add, and is the AI unlimited?

Full Plant AI is the full module list plus the AI Owner Chat, with a defined AI usage allowance set out in your quotation. Usage above the allowance is charged separately. AI usage is never unlimited. Inward to TC has everything except the AI Owner Chat.

What does data migration cost?

A standard master import is included. Assisted import is ₹15,000, legacy ERP migration is from ₹50,000, and historical transactions are a custom quote. Complex migrations are ₹2,000 an hour against an estimate you approve first. See data migration.

Can we run FIMS on our own server?

An on-premise licence is available on request. We quote it after the discovery visit.

We have more than one plant.

Prices are for one plant. Running several plants in one copy is not offered yet.

Does it do e-invoice and e-way bills?

Not today. FIMS prints the delivery challan, GST invoice and packing list. e-invoice (IRN) and e-way bill are not offered yet.

Can we see FIMS working?

Yes. We walk you through a working copy of FIMS, from customer PO to dispatch and the trace back to the heat, on a guided demo. Book a discovery visit to arrange it. Hands-on use on your own data starts at onboarding, from 7 December 2026 at the earliest, and carries a 30-day money-back guarantee.

What is the 30-day money-back guarantee?

If FIMS does not satisfy you within 30 days of onboarding, we refund the whole onboarding amount, except GST and the time spent on data import and support. The terms are written into your quotation.

Where does our data live?

In a private hosted copy of FIMS for your plant. It is never mixed with another plant’s data.

Fastener plants in Bengaluru and Hosur first

Book a discovery visit.

Thirty minutes at your plant with your owner or quality head. Bring one product family and the certificate your customers ask for most.

  • We see how a certificate is prepared today, from inward to dispatch.
  • We check FIMS against your route, material and certificate conventions.
  • You learn whether FIMS fits and what we would start with. There is no obligation.

Call, WhatsApp or email

Call or WhatsApp · Shailesh
+91 98454 54018
Call · Jyothi
+91 93802 56246
Email
sales@dooziesoft.com

Tell us your plant’s location and the product family you want to start with.